Advertisement

Peak Oil and Climate Change

As excellent introduction to peak oil and climate change, now in two versions.  Painstakingly reseached and written for all New Zealanders by Sean Millar and Adrienne Puckey.  Download for free.  The latest version has a special introduction for the rail, bus and coach industries.

A Brief Introduction to Climate Change and Peak Oil For New Zealanders

A Brief Introduction to Climate Change and Peak Oil For New Zealanders

Sound Off!

CBT Online Forum

Join the conversation at the CBT online forum.

Help! Donate!

The CBT is voluntary and runs entirely off donations. Please consider donating a small amount - $5 runs the website for a month. Details are: ASB Downtown 12-3216-0034713-00

Subscribe

To receive regular updates on CBT news and events, subscribe to our email newsgroup by sending an email to cbt_news@getmoving.org.nz, with just "Subscribe" (without quotes) in the subject line.

Search Better Transport

Website by Essential Software

Generated Traffic and Induced Travel


by Todd Litman,  Victoria Transport Policy Institute, 17 September 2007 

Abstract 

Traffic congestion tends to maintain equilibrium. Congestion reaches a point at which it constrains further growth in peak-period trips. If road capacity increases, the number of peak-period trips also increases until congestion again limits further traffic growth. The additional travel is called "generated traffic." Generated traffic consists of diverted traffic (trips shifted in time, route and destination), and induced vehicle travel (shifts from other modes, longer trips and new vehicle trips). Research indicates that generated traffic often fills a significant portion of capacity added to congested urban road.

Generated traffic has three implications for transport planning. First, it reduces the congestion reduction benefits of road capacity expansion. Second, it increases many external costs. Third, it provides relatively small user benefits because it consists of vehicle travel that consumers are most willing to forego when their costs increase. It is important to account for these factors in analysis. This paper defines types of generated traffic, discusses generated traffic impacts, recommends ways to incorporate generated traffic into evaluation, and describes alternatives to roadway capacity expansion.

Under typical urban conditions, more than half of added capacity is filled within five years of project completion by additional vehicle trips that would not otherwise occur, with additional but slower growth in later years.

Read the full article here:

www.vtpi.org/gentraf.pdf

Return