Shunted into ’70s

1 Comment
John Landrigan investigates the progress being made on electrification of Auckland’s rail network in this article in the Aucklander.
 
The Government insists that electric rail is still on, dare we say, track. But Auckland is borrowing to buy an ageing diesel fleet of British cast-offs.
 
 All abooooard the great traans-Auckland rail jooourneeey. Bear in mind, folks, there will be many stops before we reach your preferred destinations.
 
 Where do Aucklanders want to go? For more than 80 years Aucklanders have wanted modern, affordable and regular train services to drop them off near work and home.
 
 But plans have been derailed more times than Amy Winehouse has been booked into rehab and left many of us nose-to-tail, alone in our cars, listening to her croon about it.
Under the previous Government, trains were to be modernised, electrified and run underground from Britomart to Mt Eden. This would be paid for through a 9.5 cent regional fuel tax that the Auckland Regional Council championed.
But the new Government abolished regional levies in May, ostensibly to share the burden with the rest of the country through national taxes.
Now, the plan is for the Government to lend the regional council $33 million to help buy six diesel locomotives built in the 1970s, with carriages from British Rail.
To mind the gap until the money can be raised? It would seem so, but at what cost?

No matter how hard The Aucklander tried to find out, no one could tell us how much of our rates was going to subsidise our taxes for this.

Read the rest of this entry »

Onehunga Line News

No Comments

It seems as though the funding issues for the Onehunga Line, that resulted from the removal of the regional petrol tax, have been resolved. This follows on from a post I made a couple of weeks ago that related to progress being made between the ARC and NZTA to provide the necessary extra funding. It also appears as though there will be three stations along the Onehunga Branch: one at Onehunga, one at Te Papapa (quite near Mays Road) and one near Mt Smart stadium.

I have included a map of where I think the stations will be located. I’m not 100% sure of the location of the Te Papapa station and the Mt Smart station, but they would certainly not be too far from where I’ve shown them:

onehunga-line The main benefit of the Mt Smart station seems likely to be for events, and it may well turn out that this is and events only station. There isn’t much residential development within easy walking distance of the Mt Smart station – although I guess there is potential for people who live elsewhere on the rail network but work near the station to catch the train. I suspect that wouldn’t be particularly many people though.

I have a couple of hopes for this line, apart from the obvious one that it’s reasonably popular. My first hope is that it gets decent service frequencies. There aren’t that many available peak hour slots into Britomart left (due to the lack of a CBD rail loop) so I am not sure whether, at peak hour, a huge number of trains will be able to be run from Onehunga into Britomart. I think that it’s most likely that trains which currently terminate at Otahuhu will be re-routed to instead terminate at Onehunga. Off-peak I hope that the service frequencies aren’t cut back too much either – perhaps a train every 30 minutes during weekdays and at weekends would be great. And that links in with my second hope: that the service runs on Saturdays AND Sundays, and at reasonable frequencies on both those days. The reason I hope this is because I actually think it could be damn popular. The big white blob just above the Onehunga station is DessSmart Onehunga: an extremely popular shopping centre with very limited carparking. As Sylvia Park has shown, people are very eager and willing to catch trains to shopping malls at the weekend, and I imagine that Onehunga will continue that trend – if a decent weekend service is provided. And finally, clearly the Onehunga services must start and end at Britomart. That’s a bit of a no-brainer.

So the obvious question is “when will it open?” Well, according to ARTA: “services are expected to begin on the Onehunga line early next year.” So not too far away.


Coding by Essential Software | Theme based on N.Design Studio Entries RSS Comments RSS