KiwiRail’s staff newsletter, The Express (not online sorry), has a series of pictures of the new EMUs for Wellington’s electrified urban rail system. The 149-seat units are under construction at Changwon in South Korea. More details here.
You may also like
Both TVNZ and the NZ Herald report that KiwiRail is under pressure to mothball the Napier – Gisborne line, and the northern […]
The New Zealand Herald reports Transport Minister Steven Joyce is vowing to get Auckland’s $1 billion rail electrification project back on track […]
Fran O’Sullivan has a wildly optimistic take on New Zealand being a major petroleum exporter in the future. In 15 years, New […]
The Capital Connection is the successful rail service that runs between Palmerston North and Wellington. The editorial in the Manawatu Standard sums […]